MnDOT I-35W@94 Update

Hello,

This is an update for the I-35W@94 project. We will also have some updates for some other projects as well for those interested.

All closures are weather permitting and subject to change. Check 511mn.org for real-time updates.

I-35W@94 http://www.dot.state.mn.us/35w94/

Friday, Sept. 14: I-35W north will be closed at 10 p.m. Friday to 5 a.m. Saturday from I-94 to Highway 62 and I-35W south will be closed from 10 p.m. Friday, Sept. 14 to 7 a.m. Saturday, Sept. 15.

The full closure planned for Sept. 15-17 is POSTPONED. I-35W will remain open this weekend.

Sept. 18: I-35W closed in both directions from I-94 to Highway 62 at 10 p.m. Tuesday, Sept. 18 to 5 a.m. Wednesday, Sept. 19.

Coming up: I-35W closed in both directions from I-94 to Highway 62 10 p.m. Sept. 27 to 5 a.m. Sept. 28.

Highway 62 http://www.dot.state.mn.us/metro/projects/hwy62/index.html

Highway 62 west will be closed at 8 p.m. Friday, Sept. 14 to 5 a.m. Monday, Sept. 17 from Highway 100 to I-494. The detour is I-494.

Coming up: Highway 62 east closed from Highway 100 to I-494 at 8 p.m. Sept. 21 to 5 a.m. Sept. 24.

I-35W Minnesota River Bridge http://www.dot.state.mn.us/metro/projects/i35wbloomington/index.html

Watch for alternating overnight lane closures in both directions between Cliff Road and 106th Street.

I-35W Minneapolis to Roseville http://www.dot.state.mn.us/metro/projects/i35w-mpls-roseville/index.html

The ramp from I-35W south to Highway 280 south is closed until Sept. 19.

The following ramps are closed from 8 p.m. Friday, Sept. 14 to 5 a.m. Sept. 17:

Southbound I-35W to Industrial Boulevard

Industrial Boulevard to I-35W north

Industrial Boulevard to I-35W south.

Check the web page for more ramp and lane closures.

Highway 7 http://www.dot.state.mn.us/metro/projects/hwy7minnetonkaslp/index.html

Watch for single-lane closures at various times through Sept. 21 for signal installation.

University and Central Avenue signal and sidewalk work: http://www.dot.state.mn.us/metro/projects/hwy47andhwy65/

This project started Sept. 4. Watch for four-way stops and limited access to side streets. See web page for intersections.

Highway 55 Rockford to Minneapolis: http://www.dot.state.mn.us/metro/projects/hwy55safetyimprovements2018/

Watch for short-term, single-lane closures throughout the project.

I-494 East Bush Lake Road: https://www.bloomingtonmn.gov/eng/east-bush-lake-roadi-494-interchange-west-bound-ramp

The ramp from East Bush Lake Road to I-494 east will close at 4 a.m. Sept. 24 for 21 days. The detour is Industrial Blvd to Highway 100.

Coming up: Oct. 1 The ramp from I-494 east to East Bush Lake Road in Bloomington will close for 14 days.

Please let me know if you have any questions.

Thanks

Dave

Dave Aeikens

Minnesota Department of Transportation

Metro Communications and Engagement

Phone: 651-234-7511

Cell: 651-775-1261

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s